250-Bed Hospital & 500-Student Medical College
Dhaka, Bangladesh (2009 - On Going)

Bangladesh Medical Scienec & Technology Ltd
250-Bed Hospital & 500-Student Medical School
Mirpur, Dhaka, Bangladesh




Architecture Design Team:
M. Saleh Uddin
Arefeen Ibrahim
Ashik Vaskor Mannan

Structural & Electro-Mechanical: Inter Space Limited

The design concept takes lessons from organizational strategies of human body and schematically diagrams those on functions of hospital facilities.
Building systems and human body:
Skeletal System: Building Structure
Circulatory System: Building Circulation System
Skin System: Exterior Façade and Covering
Respiratory System: Air Flow
Urinary System: Water Consumption and Disposal
Muscular System: Actual Spaces
Nervous System: Administration and Building Maintenance

Total floor area: 452,432 sft
Total Number of Beds: 267 or Less
Hospital Floor Footprint Area Coverage: 16,391 sft per floor
Medical College Floor Footprint Area Coverage: 11,886 sft per floor
Total Area per floor: 28, 277 sft x 13 floors and 3 basements








Level 13 | Mechanical Room, Water Reservoir, Guest House (stair from level 12, no elevator)
Level 12 | V.I.P. Cabin and Special Class Cabin (total 13 Suits)
Level 11 | Special Class Cabin: Single Cabin (25 Beds), Twin Cabin (24 Beds) (total (49 beds)
Level 10 | General Ward (total (75 beds)
Level 9 | Free Ward and Ward (total (75 beds)
Level 8 | ICU (28 Beds), Single Cabin (15 Beds), Twin Cabin (12 Beds) (total (55 beds)
Level 7 | O.T.: Cardiac (2), Cath Lab (2), Neuro (1), Eye (1), ENT (1), General (2)
Level 6 | NNICU, Scub | O.T. Obst. (2) O.T. Ortho(1), OT Gen (1)
Level 5 | Lab & Diagnostic | Central Café + Central Catering
Level 4 | Director’s, MD, Chairman, Conf. | Imaging | X-Ray, CT, MRI, ECG
Level 3 | Outpatient Department & Doctor’s Chambers
Level 2 | Lobby, Accounting, Administration, Sample Collection & Report Delivery
Level 1| Ground Level | Waiting & Reception | Emergency, Imaging

Semi Basement Level1: 40 Vehicles, Electro-Mechanical, Medical Gas
Below Ground Basement Level 2: 90 Vehicles
Below Ground Basement Level 3: 90 Vehicles